Client: ENEL
The La Loma Solar Farm project consists of:
- Total area: 371 hectares.
- 407,316 Photovoltaic Park (PV) modules rated at 460 Watts Direct Current (WDC), yielding a total capacity of 187.36 megawatts. (MWDC).
- Construction of 8.04 km of internal access roads.
- Adaptation of 0.13 km of external access roads.
- Underground medium voltage networks at 33 kV.
- 3 km of 110 kV single-circuit network.
- The new substation is rated at 90/110 megavolt-amperes (MVA) (ONAN/ONAF) at 33/110 kV.
- The high-voltage line interconnects with the La Loma 110 kV electrical substation.
The El Paso project consists of:
- Capacity of 13.7 megawatts (MWDC).
- 25,200 panels
- Area of 21.75 hectares.
Scope of Work:
- Detailed Engineering Review: Activities for review and feedback on the design, as well as necessary modifications required on-site during the construction phase of PV LA LOMA and PV EL PASO.
- Technical Inspection of Work (TIW): Execution and development of ongoing supervision and technical inspection of the works to be performed at La Loma under the approved design for construction. This includes granting consent for construction progress at the planned stages throughout the execution of the works.
Main Activities to be Conducted:
- Technical supervision support.
- Guidance to client´s construction support areas.
- Work Schedule monitoring.
- Construction procedures follow-up.
- Surveying, quality, and quantitative control.
- Preparation of periodic construction reports.
- Project documentation management.
- Work completed certification.
- Specific project reports.
- Documentation filing.