AES COLOMBIA & CIA. S.C.A E.S.P

Supervision services for the maintenance works of flow gates, turbine rehabilitation, valve chamber, and technical support for the flow drainage of the tunjita hydropower plant.

Client: AES COLOMBIA & CIA. S.C.A E.S.P.


Scope of Work: Technical supervision services for the maintenance work of the flow gates, turbine rehabilitation, and support for draining of the Tunjita Hydropower Plant.

Main Activities:


  • Information review (Technical report of the initial survey, turbine rehabilitation, gate maintenance, valve chamber maintenance, conduit maintenance).
  • Planning information review.
  • Quality Plan review and validation.
  • Welding procedures documentation review.
  • Oversight and validation of welds non-destructive testing.
  • Dimensional control of turbine parts machining conducted by the contractor responsible for rehabilitation.
  • Turbine assembly quality assurance and quality control.
  • Gravel trap screens.
  • Oversight and validation of non-destructive testing for coating application of gates and gravel trap screens.
  • Review of design, technical specifications, and calculation spreadsheets for the tilt gates new anchors.
  • Calve chamber maintenance.


Location and Execution Timeline: Rural area of the municipality of Macanal – Boyacá. 2024.


VQ INGENIERÍA

Proyectos con futuro 

VQ INGENIERÍA proporciona servicios de consultoría a los sectores de hidrocarburos, minero, de infraestructura, industrial y de la construcción. 
Más de 20 años de experiencia

CONTÁCTENOS

Dirección 
Cra. 7Bis No. 124-10/26
Oficina 401
Bogotá, Colombia
Datos de contacto 
PBX: (57 1) 518 84 87
info@vqingenieria.com

Contáctenos

Share by: