Geomatics Services for the Mariquita - Cali Gas Pipeline.
Client:
Transgas de Occidente S.A.
Scope:
Assessment of existing data, field survey, on-site verification and updating as-built drawings of the Mariquita - Cali pipeline system. The Pipeline total length is 760 km comprising 417 km distribution lines (2”, 4” and 6” pipe diameters) and a 20” diameter main line with 343 km length.
VQ INGENIERÍA
Delivering Sustainable Projects
VQ INGENIERÍA provides consulting services to the hydrocarbons, mining, infrastructure, industrial and construction sectors.